Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) _ <br />Retum time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />0.67 0.67 <br />0.67 0.67 <br />0.50 NA <br />0.50 NA <br />2.33 ~ 1.33 <br />Total non-roadable mob/demob cost <br />' lwo rountl trips with haul rig <br />Total roadable mob/demob cost •' <br />"one rountl trip, no haul rig <br />Delta <br />30.0 miles <br />45.0 mph <br />$1,374.64 <br />$100.69 <br />JOB TIME AND COST Total job time : 4.67 hours <br />Total iob cost : 51.475 <br />EQUIPMENT HAUL DISTANCE and TIME <br />