My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:15 PM
Creation date
11/20/2007 12:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 056 <br />Date : 04/052006 <br />User: JRS <br />State :Colorado Permitfjob# : C-81-022 <br />County : Delfa Abbreviation :none <br />Site :Sanborn Creek Mine Filename : C022-056 <br />Agency or organization name : Co%redo Division Of Minerals And Ge <br />Permit or other job action ; 2006 Midterm Review <br />Task description :Remove Sewage Leach Field <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 250 <br />Basic machine :Cat 09R - 9SU <br />81ade type :Semi-Universal <br />Attachment no. i : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Utilization <br />Swell Loose <br />CCY factor : 1.165 volume <br />Source of estimated volume :Map E-3207R <br />Source of estimated swell factor :CAT Handboo <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjustod hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 % (pos) <br />Average site altitude : 6,400 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br /> <br />JOB TIME AND COST <br />Fleet size : 3 Dozer{s) <br />Unit cost : $0.559 /LCY <br />Oata source : (CRG) <br />Ownership cosUhour : $56.94 NA <br />Operating cosUhour : $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosVhour: $32.53 NA <br />Total unit cosVhour : $194.45 Total fleet cost/hour <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient :_ <br />Altitude :_ <br />Material weight :_ <br />81ade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />291 LCY <br />Source <br />0.75 (avg.) <br />0.90 (Cat HB <br />1.00 (gen.) <br />7.00 (avg.) <br />0.83 tishiff/dai <br />0.79 <br />1.00 <br />0.79 <br />1.00 <br />0.28 <br />HB) <br />34756 LCY/hr <br />1,042.69 LCY/hr <br />0.28 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.