My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:15 PM
Creation date
11/20/2007 12:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatiaa Software <br />PROJ ECT IDENTIFICATION <br />Task #: 053 <br />Date <br />User <br />04/08/2006 <br />State :Colorado <br />County :Delta <br />JRS Site : Sanborn Creek Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :2006 Midtemr Review <br />Permitfjob # : C-81-022 <br />Abbreviation :none <br />Filename : C022-053 <br />Task description : FXCaVatf/BaCkfi/1 POIId C Wall Alfa <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 330C L Horsepower : 244 <br /> Weight (MT) : 33.72 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $39.99 NA Shift basis : 1 per day <br />Operating cosUhour : $52.04 100 Data source : (CRG) <br />OperatorcosUhour: $32.72 NA <br />Total unit cosUhour : $124.74 Total Fleet cosUhour : $124.74 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 275 BCY factor : 1.250 volume : 344 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swing loaded, dump bucket, swing em <br /> Basic job condition description : AVERAGE <br /> Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.32 minutes <br />Bucket Caoacitv <br />Rated bucket capacity : 1.12 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 0.95 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,000 feet Altitude adjustment : 1.00 ' (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/tlay) <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 177.94 LCY/hour <br />Adjusted hourly unit production : 147.69 LCY/hour <br />Adjusted houdy fleet production : 147.69 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 2.33 hours <br />Unit cost : $0.845 per LCY Total job cost : $290 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.