Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3567 <br />fA%: (303) 832-0106 <br />Elk Creek Mine <br />C-81-022 <br />2006 Midterm Review <br />6 Apri12006 <br />JRS <br />TASK 049: Reconstruct/Riarau Elk Creek $161,194.00 <br />RADO <br />O N O F <br />IRALS <br />GEOLOGY <br />RECLA NATION•MINING <br />EAf ETY•ECIENCE <br />aRl Owens <br />Governor <br />Russell George <br />Enecutive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Machine Placed Riprap for Slope Protection (from RS Means Building <br />Construction Cost Data, 2006 Edition: Section 02370-450-0100) has a cost of <br />$43.10/cubic yard. <br />3740 cubic yazds aze needed for the channel reconstruction <br />($43.10/cubic yard) x (3740 Cubic Yazds) _ $161,194.00 <br />Office of Offim of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />