Laserfiche WebLink
CIRCES Cost Estimatins~ Software <br />PROJECT IDENTIFICATION <br />Task # : 034 <br />Date : 04/05/2006 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />Permit/job# : C•81-022 <br />Abbreviation :none <br />Filename : C022-034 <br />Agency or organization name :Colorado Division Of Minerals And Geo. <br />Permit or other job action :2006 Midterm Review <br />Task description :Rec-rade Pond C Access Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown: Ownership cosUhour: $56.94 NA <br />Operating cosUhour: $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cesUhour. $32.53 ~ NA <br />Total unit cosUhour : $194.45 Total fleet cosUhour : $583.36 <br />MATERIAL pUANTITIES <br />Initial Swell Loose <br />volume: 3,333 CCY factor: 1.165 volume: 3,883 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Corcection Factors Source <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock -50°6 Rock. <br />200 feet <br />700.0 LCY/hr <br />0.00 % (F <br />6,100 feet <br />2,900 Ibs/LCY <br />50% FaRh <br />JOB TIME AND COST <br />Fleet size : 3 Dozers) <br />Unit cost : $0.762 /lCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net cercectian : 0.36 <br />Adjusted unit production : 248.74 LCY/hr <br />Adjusted fleet production : 746.21 LCY/hr <br />Total job time : 5.20 Hours <br />Total job cost : $3,036 <br />