Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task tt : 032 <br />Date : 04/06/2006 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />PermiVjobit : C-81-022 <br />Abbreviation :none <br />Filename : C022-032 <br />Agency or organization name :Colorado Division Or Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />Task description :Rip and Regrade C-Seam Access Road <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $56.94 NA <br /> Operatingcost/hour : $104.98 100 <br /> Ripper op. cosilhour : $9.97 100 <br /> Operator cosUhour : $32,53 NA <br /> Total unit cosUhour : $204.43 Total fleet cosUhour : $613.28 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,056 CCY factor : 1.165 volume : 1,230 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted howdy production : 1,243.2 LCYRrr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description ; Job efkciency : 0.83 (lshiff/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fid-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6, 200 feet Material weight : 0.79 (Cat HB) <br /> Blade type :_ 1.00 (S/SU/U) <br />Material weight : 2, 900 IbslLCY Net correction : 0.36 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Ea Rh <br />Adjusted unit production : 441.76 LCY/hr <br />Adjusted fleet production : 1,325.28 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 3 Dozers) Total job time : 0.93 Hours <br />Unit cost : $0.463 /LCY Total job cost : $569 <br />