My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:15 PM
Creation date
11/20/2007 12:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Agency or organization name :Colorado Division Of Minerals <br />Permit or other job action :2008 Midterm Review <br />Task description <br />HOURLY EQUIPMENT COST <br />All Ungraded Refuse Material <br />Machine descdption :CAT 815E <br />Horsepower : 220 <br />Compactor type :Reclamation Shift basis: 1 perday <br /> Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cast/hour : $49.43 NA <br />Operating cosUhour : $59.54 100 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $141.50 Total fleet wsUhour : $141.50 <br /> <br />MATERIAL QUANTITIES r. _ <br />Loose Shrinkage Compacted <br />volume : 4,425 LCY factor : 0.875 volume : 3,872 CCY <br />Source of estimated volume :Division Estimate <br />Source of estimated shrinkage factor :CAT Handbook <br />HOURLY PRODUCTION <br />Unadlustetl hourly production = (W x S x L x C) / P <br />Compacted width per pass (VV) : 8.42 feet <br />Average compactor speed (S) : 4.00 mph <br />Compacted thickness of each lift (L) : 12.00 inches <br />Conversion constant (C) : 16.3 (5,280 R./12 in./27 cu.R.) <br />Required number of machine passes (Pj : 5 passes <br />Unadjustetl houdy unit production : 1,004.60 CCY/hr <br />Job Condition Correction Factors Source <br />Site altitude : 6, 200 feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifl/day) <br />Net job correction : 0.83 multiplier <br />Adjusted houdy unit production : 833.82 CCY/hr <br />Adjusted hourly fleet production : 833.82 CCY/hr <br />JOB TIME~AND COST ~ ~ ~ .~ - ~ ~~ ~ ~^ ~ - - <br />Fleet size : 1 compactor(s) Total job time : 4.64 hours <br />Unit cost : $0.170 per CCY Total job cost : $657 <br />
The URL can be used to link to this page
Your browser does not support the video tag.