Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 010 <br />Date : 04/0 52 00 6 <br />User : JRS <br />County :Delta <br />Site : Sanborn Creek Mine <br />Permitlot# : C-81-022 <br />Abbreviation :none <br />Filename : C022-010 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />Task description :Bac~ll and Regrade Elk Creek Mine Rock <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blatle type :Semi-Universal <br />Attachment na. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : i per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $56.94 NA <br />Operating wsVhour .. $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $194.45 Total fleet cost/hour : $583.36 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,111 CCY factor : 1.165 volume : 12,944 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />r:mm~acted fill or embankment <br />Average push gradient : 20.00 % (pos) <br />Average site altitude : 6,700 feet <br />Material weight : 2, 900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (l shifl/dat <br />Spoil pile : 0.80 (ind-r0 <br />Push gradient : 0.54 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/UJ <br />Net correction : 0.19 <br /> <br />Adjusted unit production : 135.51 LCY/hr <br />Adjusted fleet production : 406.53 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 3 Dozers) Total job time : 31.84 Hours <br />Unit cost : $1.435 /LCY Total job cost : $18,575 <br />State :Colorado <br />Catch Bencn <br />