My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:15 PM
Creation date
11/20/2007 12:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capaciri <br />Basis <br />Material weight : 2,650 pounds/LCY <br />Material description <br />Decomposed rock - 25°~ Rock, 75% Earth <br />Rated payload : 75,000 pounds <br />Payload capacity : 28.30 LCY <br />Cvcte Time <br />Scraper loading time ' : 1.00 <br />Maneuver and spread time : 0.60 <br />' loatl gme per scraper pair on push-pull motlels <br />Bowl (volume} Basis <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 28.00 LCY ••• <br />hourty production regects volume per scraper pair on push-pull motlels <br /> Job Condition Corrections : Site altitude (ft.) : 6, 200 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HBJ <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt little maintenance, no water, 2' fire <br />Haul Route <br />Seg. 4 Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 2,800 -10.00 5.00 -5.00 2972 0.99 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Retum route : <br />Return time <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour: 589.95 LCY/hour''" Adjusted forjob conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />Haul time : 0.94 minutes <br />2.70 minutes <br />3.29 minutes <br />489.66 LCY/hour <br />2 scraper(s) <br />489.66 LCY/hour <br />489.66 LCY/hour <br />^ travel time for each segment is adjusted for aaeleradoNdeceleratlon, <br />table vebciaes are max. attainable per total resistance shovm, not average <br />
The URL can be used to link to this page
Your browser does not support the video tag.