My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:15 PM
Creation date
11/20/2007 12:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 04/05/2006 <br />User: JRS <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />Task description : Bac~ll and Regrade Material Used to Widen Access Road <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU Horsepower : 905 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 pertlay <br />Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $56.94 NA <br />OperatingcosUhour: $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $32.53 NA <br />Total unit cosUhour : $194.45 Total fleet cost/hour : $583.36 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,600 CCY factor: 1.165 volume: 1,884 LCY <br /> <br />Source of estimated volume :Technical Revision 21 <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION <br />Job Condition CorreMion Factors _.. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) ~ <br /> Visibility : 1.00 (avg.) I <br />Material consistency description : Job efficiency : 0.83 (1 shiff/day) I <br />Compacted frN or embankment Spoil pile : 0.80 (fid-rf) <br /> <br />Push gradient : <br />0.83 ) I <br />(Cat HB <br />Average push gradient : 8.00 % (pos) Altitude : 1.00 (Cat HB) ~ <br />Average site altitude : 8,100 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) ~ <br />Material weight : 2,900 Ibs/LCY Net correction : 0.30 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 312.85 LCY/hr <br /> Adlusted fleet production : 938.55 LCY/hr <br />JOB TIME AND COST ~ ~~ <br />Fleet size : 3 Dozers) Total job time : 1,99 Hours <br />Unit cost : $0.822 /LCY Total jab cost : $1,159 <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />
The URL can be used to link to this page
Your browser does not support the video tag.