My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:15 PM
Creation date
11/20/2007 12:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatin Software <br />PROJECT IDENTIFIC TION <br />Task # : 125 <br />Date : 04/11/2006 <br />User; JRS <br />State :Colorado <br />County :Delta <br />Site :Elk Creek Mine <br />Agency or organization name :Colorado Division Of Minerals And Gs <br />Permit or other job action :2006 Midterm Review <br />Task description : Bac~ll and Regrade Pond E <br />HOURLY EQUIPMENT COST <br />Permitlob# : C-1981-022 <br />Abbreviation :none <br />Filename : C022-125 <br />Basic machine :Cat D9R - 95U Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment na. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cosUhour : $56.94 NA <br />Operating cosUhour : $104.98 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $3253 NA <br />Total unit cost/hour : $194.45 Total fleet cost/hour : $583.36 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume : 2,300 CCY factor : 1.125 volume <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor : CA T Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted howdy production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted Bll or embankment <br />Average push gradient : 0.00 % (I <br />Average site altitude : 6,000 feet <br />Material weight : 2, 850 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />,,,. <br />JOB 71ME AND COST <br />Fleet size : 3 Dozers) <br />Unit cost : $0.402 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost ; <br />2,588 <br />LCY <br />Source <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.80 (fnd-rt) <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.87 (Cat H8) <br />too (S/SU/U) <br />0.39 <br />