My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:15 PM
Creation date
11/20/2007 12:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 115 <br />Date : 04/112006 <br />User <br />JRS <br />State :Colorado <br />County :Delta <br />Site :Elk Creek Mine <br />Permit!)ob# : C-1981-022 <br />Abbreviation :none <br />Filename : C022-115 <br />Agency or organization name :Colorado Division Of Minerals And GE <br />Permit or other job action :2006 Midterm Review <br />Task description : Bac~ll and Regrade Pond F <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator wsUhour <br />Total unit cosUhour <br />volume: 1,020 BCY <br />Swell <br />factor <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />$56.94 NA <br />$104.98 100 <br />$0.00 0 <br />$32.53 NA <br />$194.45 Total fleet cosUhour : 5583.36 <br />Loose <br />1.330 volume : 1,357 LCY <br />Source of estimated volume :Map 2.05-M5J; Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br />Average push distance : 90 feet <br />Unadjusted hourly production : 1,351.7 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 5.00 % (I <br />Average site altitude : 6,300 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50°k Earth <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.80 (fnd-rfJ <br />0.90 (Cat HB) <br />1.00 (Cat HB) <br />0.79 (Cat HB) <br />1.00 (S/SU/U) <br />0.32 <br />433.99 LCYIhr <br />1,301.97 Lcv/nr <br />JOB TIME AND COST <br />Fleet size : 3 Dozers) Total job time : 1.04 Hours <br />Unit cost : $0.448 /LCY Total job cost : $608 <br />
The URL can be used to link to this page
Your browser does not support the video tag.