Laserfiche WebLink
i e. Flnal grading will be done with lerge dozer equipment <br />that will leave a rough slope which will help to <br />eliminate slippage zones. <br />~ f. Not applicable. <br />~~ g. Fertilizer or other soil amendments shall be added if <br />the test plot indicates it will have a substantial <br />lasting benefit on the revegetation. <br />h. Vegetative piles shall be incorporated into the over- <br />burden ae mulching. <br />5. a. Land shall be revegetated with native speci.ea exclusively <br />in at least an equal extent of cover to the: natural <br />vegetation of the surrounding area which is scattered <br />too rare. The Pinon pine trees will be incorporated in <br />the revegetation plan if the test plot now under way <br />proves to be satisfactory. <br />b. Not applicable. <br />c. Not applicable. <br />d. A test plot has been established to determine the <br />greatest probability of success in plant establishment. <br />Attention is being given to biological factors such as <br />proper innoculation of legume seed, appropriate seeding <br />and trans-planting practices. <br />e. Site preporation shall include ripping, mulching, soil <br />amendments and fertilizers will be used if the teat plot <br />indicates substantial benefits can be derived. Irrigation <br />can not be considered as no water exist in the area. <br />f. Prohibited noxious weed species will be controlled by <br />• chemical spraying or other approved methods. <br />