Laserfiche WebLink
Doc Date:12/1112001 III III I II I II IIII III <br />~I ~ 999 <br />~~ 2.06.3 Mountaintop Removal Mining ~~ <br />• The mine plan calls for a slice of the west side of the <br />nose of a ridge to be mined and reclaimed to its approximate <br />original contour in Phase 2 of the operation. The new access <br />road to adjoining property, and the TV tower, crossing this <br />pit area must be constructed to the approximate original <br />contour to maintain the projected 109s grade. The removal, and <br />replacement, of this segment of the ridge is not considered <br />"Mountaintop Removal Mining". See Map 7 for details. <br />• <br />• <br />