Laserfiche WebLink
<br /> <br />G. Settling po~:d Qry Units Unit Cost Cos! <br />1. Place overburden, 6" on 4 ac 3,226 CY $ 1.25 4,033 <br />2. Place topsoil, 6" over 4 ac 3,226 CY 1.25 4,033 <br />3. Seed and mulch 4 AC 800.00 1,600 <br />H Lakeshore Topsoiling and Reseeding <br />1. Seed and mulch 1 AC 800.00 800 <br />I. Backfilling from the 100' setback to the 200' <br />Setback jor a 1000' length and 19' depth 62,740 CY 1.25 78,425 <br />Disturbance Costs $208,852 <br />Contractor Mob/Demob (8%) $ 16,708 <br />Overhead (18.5%) $ 38 638 <br />Administrative (5%) $ 10,443 <br />V 13 <br />Total Proposed Financial Warranty $294,6Q1-`' <br />l 8' S4Z <br />Disturbed Acreage 34 ~ 1 S ~,07~ <br />Financial Warranty per Acre $8,078 <br />River ['iew Resource, CAMAS Colorado, lrtc. <br />DMG ll2 Permi( <br />