My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44760
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:13 PM
Creation date
11/20/2007 12:02:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999098
IBM Index Class Name
Permit File
Doc Date
2/3/2000
Doc Name
RIVERVIEW RESOURCES 112 APPLICATION CAMAS COLORADO INC DMG M-99-088
From
TUTTLE APPLEGATE INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />volume by a minimum of a 90-day test. Ongoing monitoring of the water balance may also <br />be required as determined by the Division Engineer. The frequency of accounting and <br />monitoring as well as the type and accuracy of the monitoring devices shall be determined <br />after consultation with the Division Engineer. <br />The applicant shall demonstrate that during a 90-day test period the unregulated ground <br />water inflow to the pit does not exceed the Performance Standard. Demonstration of inflows <br />less than the Performance Standard shall be sufficient cause for a determination that the <br />applicant has wnstructed a lined reservoir and is entitled to store water. If the unregulated <br />ground water inflow to the reservoir exceeds the Performance Standard, the State Engineer <br />shall require the reservoir to be dewatered until satisfactory changes have been made to the <br />liner to conduct another initial liner test. <br />4.0 Water Budoet Accountin <br />Monthly accounting shall be required as long as the liner continues to meet the Design <br />Standard. Weekly accounting (or more frequent if required by the Division Engineer) shall be <br />required for liners which do not meet the Design Standard but continue to meet the <br />Performance Standard. Evidence of compliance with the standards shall be established <br />through a mass balance analysis accounting for inflows, outflows, and change in storage. <br />If the State or Division Engineer determines that the ground water inflow (leakage rate) into <br />the reservoir is greater than the Performance Standard, the applicant shall be required to <br />calculate the inflow to or outflow from the reservoir by means of amass-balance analysis on <br />a 48-hour basis, and return to the stream system such inflows to the pit within 48 hours, <br />without such water being used by applicant in any manner. This 48-hour accounting shall <br />only be for the entire period specified under the Liner Failure During Operation Section (see <br />below) and shall not be done permanently. <br />5.0 Liner Failure Durino Operation <br />In the event that the average daily unregulated ground water inflow to the reservoir exceeds <br />the Performance Standard for two consecutive months, as evidenced by accounting (see <br />above), the applicant or their successor and the State Engineers Office shall begin to consult <br />regarding the probable cause of the unregulated inflow, and the appropriate actions to be <br />taken in response thereto. If the State or Division Engineer and the applicant cannot reach <br />an agreement on the appropriate actions to reduce the inflow to less than the Performance <br />Standard within nine months of the beginning of the consultations, the State or Division <br />Engineer shall provide written notice to the applicant of their determination to correct this <br />problem. The 48-hour accounting shall begin following the two consecutive months that the <br />Performance Standard is exceeded and shall continue until the applicant has demonstrated <br />that the Performance Standard has been met. Applicant shall have two (2) years from the <br />date of such written notice of liner failure to repair the liner to an inflow less than the <br />Performance Standard. If such a repair is not made the State or Division Engineer shall <br />declare the reservoir a well requiring a well permit and the applicant will not be entitled to <br />store water until such time a repair is made. <br />6.0 Leoal Storaoe of Water <br />Water shall not be impounded in the reservoir except pursuant to lawful diversions allowed by <br />statute or decree. At all other times, all inflow of water into the reservoir from any source, <br />Lining Criteria for Gravel Pits.doc 2 07/27/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.