Laserfiche WebLink
i <br />1 <br />i <br />1 <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />M <br />t <br />STEEPEN ROBERTSON & KIRSTEN PROJECT BATTLE M7. GOLD _ <br />PROJECT Mo. <br />Censultln~ Ea~leeers BORMO LOCATgN E II.O~G 000 <br />DATE 8/27/88 _ <br />PIEZOMETER DETAILS <br />+4.2' <br />TOP OF PVC <br />BH-8 <br />tOF1 <br />F. BARBIS <br />EL. 5666 GROUND SURFACE <br />DEDE T <br />DEPTH 62.8' SWL (7/12/86) <br />DEPTH Se.o' TOP OF SEAL <br />DEPTH 84. D' TOP OF BACKFILL <br />DEPTH 7s.D TOP OF SCREEN <br />8.4' OF FINE SAND <br />IN PIEZOMETER <br />NOTES: <br />1. NOT DRAWN TO SCALE <br />2. SEE BORIND LOO FOR <br />DETAILED SOIL/ROCK <br />DESCRIPTION <br />DEPTH 84.8 <br />DEPTH S9.o BOTTOM OF SCREEN <br />DEPTH BOTTOM OF CASING <br />DEPTH Bs.e BOTTOM OF BORING <br />