My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44742
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:12 PM
Creation date
11/20/2007 12:02:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
APPENDIX E PIEZOMETER COMPLETION DATA AND FALLING HEAD PERMEABILITY TEST RESULTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />FIELD PERMEABILITY TEST <br />PROJECT: San Luis BOREHOLE NO.: 8H - 9 <br />JOB NO.: 14702 DATE: 07/16/88 <br />VARIABLE HEAD METHOD <br />INITIAL HT. TO HATER: none feet PIPE DIAMETER: n/e cm <br />NT. TO WATER ADDED FOR TEST: 0.00 feet PIPE AREA: n/a cm2 <br />TOTAL DEPTH OF BOREHOLE: 80.00 feet BOREHOLE DIAMETER: 15.24 cm <br />TOP OF PI DE TO GROUND: 0.00 feet BOREHOLE AREA: 182.41 cm2 <br />Note: No standpipe in borehole <br /> PERMEABILITY <br />Date Time Increment Tota( Yater Chenge in Increm. Curet. <br /> Elapsed Elapsed Level Ht. of Perm- Perm• <br /> Time Time Reading 4ater ability ability <br />00/00/00 (Xrs.) (Sec.) (Sec.) (F t.) (Ft.) K K <br /> (crNsec) (cm/sec) <br />07/16/88 14.50 0.00 <br />07/16/88 14.52 60 60 1.30 1.30 2.3E-04 2.3E-04 <br />07/16/88 14.53 60 120 2.40 1.10 2.6E-04 2.8E-04 <br />07/16/88 14.55 60 180 3.30 0.90 2.1E-04 2.6E-04 <br />07/16/88 14.57 60 240 4.20 0.90 2.1E-04 2.5E-04 <br />07/16/88 14.58 60 300 5.10 0.90 2.2E-04 2.4E-04 <br />07/16/88 14.60 60 360 5.60 0.50 1.2E-04 2.2E-D4 <br />07/16/88 14.62 60 420 6.00 0.40 9.8E-05 2.0E-04 <br />07/16/88 14.63 60 480 6.50 0.50 1.2E~04 1.9E-04 <br />07/16/88 14.65 60 540 7.30 0.80 2.0E-04 1.9E-04 <br />07/16/88 14.67 60 600 8.20 0.90 2.3E-04 2.0E-04 <br />07/16/88 14.75 300 900 10.10 1.90 9.8E-05 1.6E-04 <br />07/16/88 14.83 300 1,200 12.90 2.80 1.5E-04 1.6E-04 <br />07/16/88 14.92 300 1,500 15.00 2.10 1.2E-04 1.5E-04 <br />07/16/88 15.00 300 1,800 16.70 1.70 9.7E-OS 1.4E-04 <br />07/16/88 15.08 300 2,100 18.50 1.80 1.1E ~04 1.4E-04 <br />07/16/88 15.17 300 2,400 20.10 1.60 9.6E-05 1.3E•OL <br />07/16/88 15.25 300 2,700 21.50 1.40 B.bE-OS 1.3E-04 <br /> d2 ~n / 2mL1 {'~ <br />// <br />Note: Per meability calculations peformed using the following formula: Kh= ~ <br />~n ~ <br /> <br /> p = Dramet er, Intake, cm <br /> d = Diameter, Standpipe <br /> Length, In take <br /> {, = lime, sec <br /> F{ = pi ezome[ri c Nead <br />Reference: Yin t erkorn, Xans F. and Ferg, Nsai -Tarp (1975). Foundation Engi neering Handbook, <br /> Van Nost ranad Reinhold Company, Neu York, 32 p. <br />
The URL can be used to link to this page
Your browser does not support the video tag.