Laserfiche WebLink
<br /> <br />~' <br />3.1.5(3), in part, all highwalls shall be stabilized. You need to demonstrate compliance with the <br />applicable performance standards of Rule 3.1.5(3) by submitting a slope stability analyses for those <br />highwalls that are steeper than 3:1. <br />Exhibit D - c(i) - provide a narrative to explain how topsoil will be replaced. Especially on the <br />disturbed highwall areas. <br />Exhibit D - c(ii) -explain how the highwall disturbance will be scarified. <br />-Exhibit D - c(iii) -the proposed seed mix does not agree with the seed mix on the reclamation plan <br />map. Please address. <br />Exhibit D - c(v) - provide a narrative describing how the mulch will be applied and crimped on the <br />highwall dismrbance. <br />Pursuant to Rule 1.8, you must submit a copy of this letter and a copy of your response with the County <br />1LClerk and Recorder and submit and affidavit or receipt to the Division demonstrating that the Clerk and <br />~ Recorder received the permit application revision. <br />Prior to Division consideration of the application, you need to submit proof of publication and proof of <br />~~.~-all required notices. <br />Please be advised that the permit application may be deemed inadequate, and your application may be <br />denied on March 1, 1999, unless the above noted adequacy items are addressed to the satisfaction of the <br />Division. <br />If you have any questions, please give me a call. <br />~cerely, ~ <br />l ~ <br />James Dillie <br />Environmental Protection Specialist <br />cc: Jerald Seifert and Fred Lowry <br />