Laserfiche WebLink
.TABLE OF CONTENTS (CON <br />LIST OF TABLES <br />TableNo. Title Paee <br />1 Selection and Application of Best Management Practices .............. ......... 7-1 <br />2 Soil Series Characteristics .................................................. .........7-2 <br />3 Typical Critical Area Stabilization Seed Mixture ......................... ......... 7-3 <br />4 Water Bar Spacing (feet) for Relative Erosion Hazard Classes ........ ......... 7-4 <br />5 Potential Revegetation Species ............................................. .........7-5 <br />6 Interim Revegetation Seed Mix[ure ........................................ ......... 7-6 <br />7 Permanent Revegetation Seed Mixture-Foothills Swale ................ .........7-7 <br />8 Permanent Revegetation Seed Mixture-Pinyon/Juniper ................. .........7-8 <br />9 Permanent Revegetation Seed Mixture-Rolling Loam .................. .........7-9 <br />10 Permanent Revegetation Seed Mixture-Dry Exposure .................. ........ 7-10 <br />l I Mulch and Geotextile Fabric Use Guide .................................. ........ 7-1 l <br />l2 Potential Noxious Weed Species .......................................... ........ 7-12 <br />13 Revegetation Success Criteria .............................................. ........ 7-13 <br /> LIST OF FIGURES <br />Figure No. Title Paee <br />l Typical Silt Fence Locations ............................................... .........8-l <br />2 Typical Straw Or Hay Bale Filter/Check Dam Installation ............. ......... 8-2 <br />3 Typical Straw Or Hay Bale Filter/Check Dam With Filter Outlet ...... ......... 8-3 <br />4 Typical Geotextile Fabric Installation ..................................... ......... 8-4 <br />5 Typical Road Drains ........................................................ ......... 8-S <br />6 Typical Road Low-Water Crossing ....................................... ......... 8-6 <br />7 Typical Access Road Drainage Configurations .......................... ......... 8-7 <br />8 Typical Channel Contigurations ........................................... ......... 8-8 <br />9 Typical Road Water Bar Installation ...................................... ......... 8-9 <br />l0 Typical Culvert [nstallation ................................................. ........ 8-]0 <br /> Typical Culvert Outlet Apron installation ................................. ........ 8-1 l <br />l2 Typical Lined Channel Contiguration ..................................... ........ 8-12 <br />13 Grading and Soil Reconstruction Schematics ............................ ........ 8-13 <br />14 Production: Total Vegetation Cover Nomograph ....................... ........ 8-14 <br />IS Ground Cover Sampling Procedure at a Systematic Sample Site Location... 8-IS <br />American Sala. L.L.P. Ill <br />Soil Conscrvatton. Erosion and Sediment <br />Conwl. Reclamation, and Revegnanon Plan <br />(ktober 28. 1998 <br />Revised Apri19, 1999 <br />