Laserfiche WebLink
• III IIIIIIIIIIIII III <br />%pF <br />!F: ~~~Qp' <br />~: , ~,~ 9\ <br />~~ o' DEPARTM N ~ OF NATURAL RESOURCES <br />~,~,~,, ~ * Davitl H Getch .. E ecutrve Director <br />,,b;~: <br />\x~~"~ MINED LAND RECLAMATION DI\ <br />X1876 DAVID C. SHELTON, Director <br />gichartl D. Lamm <br />Governor <br />December 7., 1986 <br />Stevan L O'Brian <br />Environment InC <br />9989 West 60th Ave #200 <br />Aravada, CO 80004 <br />Re: M-86-147, Harley Pit 1, Permit Issuance <br />Dear Mr. O'Brian: <br /> <br />On December 02, 1986, the Mined Land Reclamation Division found Sterling <br />Ready-Mix Concrete Co to have satisfied the applicable requirements of <br />C.R.S. 34-32-101 et seq. for obtaining a mining and reclamation permit. <br />Therefore, a permlt is being issued. Two signed originals of the permit have <br />been executed. We have kept one copy for our files and are enclosing one copy <br />for your use. Please read the terms of the permit. It is your responsibility <br />to comply with all of the terms of the permit. As a reminder, here are a few <br />things we feel are important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, December 02, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />E50.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, <br />~a ~ / <br />DAVID C. SHELTON <br />Director <br />Enclosures <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />