Laserfiche WebLink
<br />1 <br />LJ <br /> <br /> <br />t <br /> <br /> <br /> <br />1 <br />1 <br />lJ <br />1 <br />t <br /> <br /> <br /> <br /> <br /> <br />Exhibit L - Reclamation Costs <br />Mining of the site will create a pond of approximately 20.9 acres in <br />area. Reclamation will be done in conjunction with the operation, the <br />following estimates are thus probably somewhat conservative. Reclamation <br />tasks are based on a site with approximately 3.2 acres of shoreline <br />(including area below water). An additional 3.9 acres of area immediately <br />adjacent to the shore (a total of about 6 acres of area above water which <br />will have topsoil replaced) and one area, an additional 1.4 acres <br />(approximate) in size, designated only for the stockpiling of topsoil are <br />included in the estimated reclamation costs. The remainder of the site is <br />to remain undisturbed. <br />- Grade pit sideslopes with D-8 dozer. Approx. <br />3.2 ac. of shoreline (includes area below water) X <br />$750/ac. 2,400 <br />- Replace approximately 8-10 (ave. 9 in.) inches of <br />topsoil, (approx. 7,260 cu. yd.) on 6 ac. (shore area <br />above water and and immediately adjacent areas) using <br />a 621-B scraper and D-9 dozer. Average $0.90/cu.yrd. 6,534 <br />- Seed and seeding. $150/ac. X 7.4 ac. 1,110 <br />- Ripping/discing. $100/ac. X 7.4 ac. 740 <br />- Fertilize ac. @ $70/ac. X 7.4 ac. 518 <br />- Mulch 1.5 tons/ac., mechanically crimped. <br />$240/ac X 7.4 ac. 1,776 <br />- Mobilize/demobilize equipment. 500 <br />Total $13,578 <br />1 <br />