My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44671
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:07 PM
Creation date
11/20/2007 12:01:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
page 454 - 539
Section_Exhibit Name
SECTION 2.05 OPERATION PLAN PART 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provides uniform, gentle alopea which will eliminate the <br />' concentration of runoff and will alleviate previously exper- <br />ienced erroeion problems at the site. The gentle 3 hori- <br />zontal to 1 vertical aide alopea will allow all runoff to <br />flow uniformly away from the embanl~eat and either to the <br />south collection ditch, where it will be directly routed to <br />the sedimentation pond located west of the refuse disposal <br />embanlonent or directly to the sedimentation pond. Because <br />the sedimentation pond and ditches were initially designed <br />for a refuse diapoeal facility similar is size and configura- <br />tion to that presented herein, no modifications to the drain- <br />age control system other than those described above are <br />contemplated by this revision. <br />The entire rock uaderdrain contained in the initial design <br />was installed by the previous operator. This uaderdrain is <br />visually depicted oa crone aectioat Al-A1' through E-E' <br />contained is Exhibit D, Disturbed Area o! Cross Sections aa~ <br />is Exhibit F~,Coal Processing Waste Embaal~~ ..-'The \1 <br />. construction of the rock uaderdrain was certified as required <br />I by Ru_~ 9._1 C11) during its construction in_1982 and 1983_ <br />A copy of the certification is presented oa page 479. A <br />monitor well designed to collect data regarding the impact of <br />the refuse diapoeal area on subsurface flows was installed by <br />the previous operator near the west end of the refuse embank- <br />ment just upstress from the aedimeatatioa pond. No modifica- <br />tions to this well or its monitoring and reporting are <br />contemplated by this revision. <br />3. Construction: M with the previous two designs, prior to <br />refuse diapoeal in undisturbed areas, all vegetation and soil <br />will be removed from the site. All reiuae material will be <br />placed in lifts no greater than 2 feet in vertical thickness <br />and will be compacted to at least 90 percent of the maximum <br />dry density ae determined by previous tenting of the refuse <br />material. This density is 96.4 pounds per cubic loot. If <br />. necessary, a sheep's-toot roller or other compaction device <br />468 <br />Revised 1/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.