Laserfiche WebLink
RECEIVED <br /> <br />CONSTRUCTION MATERIALS <br />LIMITED IMPACT (110) OPERATION <br />RECLAMATION PERMIT APPLICATION FORM <br />APR 1 8 2006 <br />Oivisian of Minerals and Geology <br />CHECK ONE: There is a File Number Already Assigned to this Operation <br />Permit # M -_-_-_ (Please reference the file number currently assigned to this operation) <br />.~,_ New Application (Rule 1.4.5) Amendment Application (Rule 1.10) <br />Conversion Application (Rule 1.11) <br />Permit # M - _ (provide for Amendments and Conversions of existing permits) <br />The application for a Construction Materials Limited Impact (I10) Operation Reclamation Pemtit wntains three major pate: (1) the <br />application form; (2) Exhibits A-J, Exhibit L, Addendtun 1, any sections ofExhibit 6.5 and Geotechnical Stability Exhibit, as requved <br />by the Office, and outlined in Rules 6.1, 6.2, 6.3, 6.5, and 1.6.2(1)(b); and (3) the application fee. When you submit your application, be <br />sure to include one (1) com Ip_ete siatted and notazized ORIGINAL and one (1) copy ofthe completed application form, two (2) copies <br />of Exhibits A-J, Exhibit L, Addendum 1, and appropriate sections of 6.5 (Geotechnical Stability Exhibit), as required, and a check for <br />the application fee described under (4) below. Exlv`bits should NOT be bound or in a 3-ring binder, maps should be folded to 8 1/2" X <br />11" or 8 1/2" X 14"size. To expedite processing, please provide the information in the format and order described in this form. <br /> GENERAL OPERATION INFORMATION <br />Type or print clearly, in the space provided, ALL information described below. <br />1. Ao olicanUooerator or comoanvname (name to be used on oermitl;Chevron Shale Oil Company, a division of Chevron U.S.A. Inc <br /> 1.1 Type of organization (corporation, partnership, etc.): Corporation <br />2. On eration name (oit, mine or site Hamel: North Cleaz Creek Construction Materials Mine <br />3. Permitted acreaee thew or eaistine site]: permitted acres <br /> 3.1 Change in acreage (+) 8.0 acres <br /> 3.2 Total Acreage in Permit Area 8.0 acres <br />4. Fees: <br /> 4.1 New Application: 1 094.00 application fee <br /> Amendment Fee (C.R.S. 34-32.5-125(II)): 719.00 application fee <br /> 4.2 Conversion Fee (from 110d to 110 875.00 conversion fee (Rule 1.11.2(2)) <br />i. Primarv commoditielsl to be mined: Construction Materials <br /> 51 Incidental commoditie(s) to be mined: 1. 0 / Ibs/Tons/vr 2. / lbs/Tons/yr 3. / lbs/Tons/yr <br /> 4. / ]bs/Tons/vr 5. / ]bs/TonsJyr <br /> 5.2 Anticipated end use of primary commoditie(s) to be mined: Construction Materials <br /> Anticipated end use of incidental commoditie(s) to be mined: NA <br />