Laserfiche WebLink
s a <br />17 <br /> <br />AC3'NI7Y` <br />:::;:.'i111itENS1O1+fS::,: t <br />:;.G1UAPt. t7Y.. <br />..AV>RA6E:; <br />:>::v~ARRirN7Y' <br /> ,, . <br />Strip Unit III X(675 +780) 3,031 CY 381 f TopsoiNng <br />Topsoil x 150 x 0.75 (2.51 Ac) $897 <br />Dozer-strip [X(450+675)] x 9,375 CY 55 f Beckfilling ('f.) <br />Overburden {150)x(3) (1.94 Ac) $1,402 <br />West Headway 'f,(3 x 9) x (150) 75 CY 9 f Bulldozing <br />3:1 Reduction (0.06 Ac) $17 <br />Topsoiling & Topsoiling 8 <br />Re-vegetation Seed/Mulch <br /> --- --- --- (incWdedabove) <br />Strip Unit IV '/, (780 + 890) x 3,479 CY 435 f Topsoiling <br />Topsoil (150) z (0.75) (2.88 Ac) $1,029 <br />Dozer-strip 'f, (675 + 780) 18,188 CY 55 f BackfilGng <br />Overburden x (150) x (4'/,) (2.51 Ac) $4,237 <br />Topsoiling --- --- --- (incWdedwNnit <br /> II, above) <br />West Headwall 'f. (3 x 9) x (150) 75 CY 9 f Bulldozing <br />3:1 Reduction (0.06 Ac) $17 <br />Revegetation 'F, (735+840) x (150) (2.71 Ac) SeedlMulch <br /> $1,220 <br />Strip Urut V '/~ (915 + 1105) 4,208 CY 1015 f Topsoiling <br />Topsoil x (150) x (0,75) (3.39 AC) $1,245 <br />Dozer-strip 35(780+gg0) 23,194CY 55f Bac~uing <br />Overburden x (150) x (5) (2.88 Ac) $5,403 <br />Topsoi4ng - - - - - - - - - (included wNnit <br /> III, above) <br />West Headwa0 'f, (3 x 9) x (150) 75CY 9 f Bulldozing <br />3:1 Reduction (0,06 Ac) $17 <br />Re-vegetation X (845 + 950) x (150) (3.09 Ac) - - - Seed/Mulch <br /> $1,390 <br />