Laserfiche WebLink
.. <br />Colorado Divis ron of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FOAM - BULLDOZER WORK <br />Task q: 3 Prep. by: BK Task File Name: M03E-3 <br />____________ _________ _____________ <br />Date: 05/26/98 Permit M:M-98-03B Mine. Two Rivera <br />Permit Action: new permit <br />_____________________________________________________________ <br />Task Description: spread 6 inches of topsoil <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COST <br />_____________________ Basic Machine: Cat DBN Horsepower: 285 <br />Blade Type: UNIVERSAL <br />Attachment ql: RO PS Cab Shift Basis: 1/day <br />Attachment p2: 1-shank ripper --""--""- <br />Cost Breakdown: <br />""""-"'-' Utilization t <br />Ownership cost/hr = 544.38 N/A <br />Operating d overhaul cost/h r- dozer = $55.31 100 <br />-ripper = 54.50 50 <br />Operator cost/hr = $23.12 N/A <br />Total egpc. unit cast/hr = 512].70 Total flee[ cos[/hr: 512"1.30 <br />________ ________ <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 32,000.0 BCY Fa c[or: 2.000 Volume: 64,000.0 LCY <br />____________ __________ _____________ <br />Source of qua n[ity take-off: page 3 <br />____________________________________________________ <br />Source of est. swell factor: page 2 <br />____________________________________________________ <br />HOURLY PRODUCTION <br />_-____________= Job Condreron Correction Factors <br />Avg. push distance: 200 Et. '""""'"" "-'-------" -""""""" """ <br /> " " ""' Operator.......... 0 .76 lavg.) <br />Unadjus [ed hourly Mat. consistency.. 1 .10 (Ca[ [bl) <br />dozer production: 593 LCY/hr Dozing method..... 1 .20 (slot) <br /> ""-"-- Visibility........ 1 .00 (avg.) <br />Material consistency : Sob efficiency.... O .B3 (lsh/dayl <br />Partly consolidated stockpile Spoil pile factor. 0 .90 (ssd-fc) <br />" "-' " " '"""' Push gradient..... 1 .05 (Cat tbll <br />Avg. push gradient: 2.00 k Inegl Altitude deration. 1 .00 (Cat tbll <br /> ""----- Material weigh[... 1 .00 (Cat tbll <br />Avg. site altitude: 5]00 <br />_________ ft. Blade type........ <br />_____________________ 1 <br />_________ .00 <br />__ (S or U) <br />Material weight 2300.00 16/LCY Net Job Correct ron 0 .77 <br />Mat. Descr.: ------""" <br />GENERAL FILL <br />____________________ <br />_________ <br />________ Adj used Unit Prod.: 420. <br />_________ 17 <br />__ LCY/hr <br /> Adjusted Flee[ Productron: 920. 17 LCY/hr <br />JOB COST <br />Flee[ size 1 <br />________ Dozed s) Total Job Time: 152. <br />_________ 32 <br />__ Hours <br />Un1t Cost $0.303 /LCY Total Job Cos[: $19,390. 33 <br />