Laserfiche WebLink
<br />RECLAMATION COST $U~4MRY cont'd <br /> <br />sheet 3 of 9 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cos[ (51 <br />Subtotal (H): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No. Task Description ~ Cos[ (51 <br />________________________________________________________________________ <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost ($) <br />2 ~ spread 1B inches of sub soil over 90 acres ~~ $36,596 <br />3 ~ spread 6 inches of top soil over 90 acres ~ $19,390 <br />Subtotal (JI: 555,936 <br />