Laserfiche WebLink
RESPONSE <br />The exisring Foidel Creek Mine surface facilities consist of building structures, material handling system, utilities, <br />and surface azeas as shown on Map 24, Surface Facilities. Untopsoiled azeas within the surface facilities area may <br />be leveled and then utilized for additional storage. <br />Buildings <br />The original mine administrative office was a 60 foot by 36 foot modulaz trailer structure, was modified to allow <br />for the cold weather and heavy snow load of the azea. That administrative structure contained 11 offices for the <br />mine staff. As the mine expanded, a new office/bathhouse complex was built to replace the modular trailers, as <br />indicated on Map 24, Surface Facilities. <br />Tn the interim, another administrative office was added for mine staff. The 36 foot by 56 foot trailer was located <br />west of the original administrative office. The trailer contained a bathroom and was hooked up to the existing <br />septic and water systems. Electrical power was supplied to the trailer by a transformer located on the east side of <br />the trailer. The location is shown on Map 24, Surface Facilities. In 1995, a temporary office trailer with <br />dimensions of 24' x 66' x 12' was leveled and blocked south of the administration building. There were no <br />water and sewer hook-ups, and a 40' long buried conduit brought in power from an existing transformer. The <br />location is delineated on Map 24. Bonding calculations addressing the temporary office trailer aze presented on <br />page 2.OS-S4(f)S8. <br />MR 03-182 2.OS-17.2 (L 02/25/03 <br />