Laserfiche WebLink
r <br />EXHIBIT 19 <br />BONDING SCHEDULE _ _ <br />MR <br />CONCRETE CONTAINMENTS <br />T <br />1. Bulk Storage Tank Removal <br />2 @ $250/tank $ 500 <br />2. Concrete containment removal <br />13 cubic yards @ $100/cu. yd. $1,300 <br />3. Backfilling and Grading $ 0 <br />None required <br />4. Revegetation $ 0 <br />Surface is previously disturbed and <br />bonded for spreading subsoil, topsoil, <br />and reseeding. Therefore, none <br />required. <br />i TOTAL $1,800 <br /> <br />1 <br />