Laserfiche WebLink
l~ <br />Minor Revision No. 63 Bond Summary <br />Exhibit 19 (Continued) <br />5. Cementing Cased_Holes (cont.): <br />d) Haul water: 4 trips x $50./trip..$ 200. <br />e) Marker: 2 marker x $12.......... $ 24. <br />Labor: 1 man x $15./hr x 4 hrs...$ 60. <br />Cement:4 sacks x $7./sack........$ 28. <br />f) Water cost:$25./load x 4 loads...$ 100. <br />Total Cost: (a + b + c + d + e + f) ................$ 4,032. <br />• <br />6. Cut and Fill <br />Common earth, minimal haul distance <br />2,333 total yards x $0.75/yd ........................$ 1,750. <br />7. Mobilization and Demobilization: <br />a) Drill rig and associated equipment..$ 1,000. <br />b) Dozer and grader ....................$ 300. <br />c) Move from site to site ..............$ 100. <br />Total Cost: (a + b + c) ............................$ 1,400. <br />TOTAL ESTIMATED BONDING REQUIREMENT :....................$ 10,000. <br />L J <br />