Laserfiche WebLink
<br />EXHIBIT 19 <br />BONDING SCHEDULE <br />MR 56 <br />METHANE VENT PUMPS <br />1. Site Removal - 4 Locations <br />a)Remove fencing around sites <br />Labors 4 x 4hr. @ $20/hr $320 <br />b) Remove gravel base and haul to disposal area <br />Front end loader 4 x 2hr. @ $50/hr $400 <br />Dump truck 4 x 2hr. @ $45/hr $360 <br />c) Remove pump units <br />Labor with Truck 4 x 2hr. @ $25/hr $200 <br />• <br />2. Reclamation and Vegetation of sites <br />Currently included in Degas Hole reclamation <br />of drill sites. ~0 <br />TOTAL $1280 <br />s <br />