Laserfiche WebLink
<br /> <br />EXHIBIT 19 <br />BONDING SCHEDULE <br />MR 50 <br />Belt Freeze-oroofing Tank <br />1. Tank removal <br />Portable tank; cost to haul to disposal ;500.00 <br />facility <br />2. Grading and Seeding <br />Currently bonded in mine area bond- no <br />increase in acreage 0.00 <br />TOTAL 5500.00 <br />• <br />• <br />