Laserfiche WebLink
• EXHIBIT 19 <br />SCHEDULE MR-37 <br />Bonding Calculations For Methane Pumps <br />Structure Removal <br />1. Remove Pumps (Approximately 1,500 lbs. ) <br />Load and transport to Salvage Facility ; 1,000 <br />2. Remove Gravel Pad (Approximately 400 Ft.~ <br />X 8 inches) <br />10 Yds. @ ;15/Yd. = 150 <br />3. Remove Chain Link Fence (400 Linear Feet) <br />400 L.F. x ;1.54 ~ 600 <br />Sackfillina. Grading, and Reveaetation <br />Surface is previously disturbed and bonded for <br />• grading, spreading subsoil and topsoil, and <br />reseeding. None required. <br />TOTAL <br />1,750 <br />C <br />