Laserfiche WebLink
Revised 01-31-92 <br />EXHIBIT 19 <br />SCHEDULE MR-28 <br />(Bonding Requirements MR-28) <br />• <br />A. Modular Metal Building <br />1,200 C.F. X $0.22 $ 265 <br />B. Concrete <br />Mesh reinforced 150 S.F. X $2.90 = 435 <br />C. Holding Tank (Removal) 250 <br />TOTAL <br />$ 950 <br />Note: Top and Subsoil have already been removed and <br />stockpiled. Surface is graveled. Surface reclamation costs <br />for grading and seeding of this area have already been <br />bonded. <br />Basis: Means Facility Cost Data 1992 <br />• <br />