Laserfiche WebLink
RECLAMATION CAST BREAKDO4d1 CALCULATIONS <br />~ <br />• <br />A. Slope Entry <br />1. Install standard explosion proof seal <br />Material: 20' x 12"/16" = 15 blocks <br /> 10' x 12"/16" = 15 rows <br /> 15 x 15 x 2 thick = 450 blocks <br />Pilaster 60 <br /> 510 blocks <br />510 blocks @ $1.12 = $571 <br />30 cf Mortar @ $5.00/cf = 150 <br />20 5-gal celtite @ $20 = 400 <br />Labor <br />Installation, 2 men 10 shifts = 20 MS <br />Remove rail, 4 shifts = 4 MS <br />24 MS <br />24 x $100 x 1.6 = <br />Subtotal <br />2. Drill and shoot headwall <br />3. Backfilling slope entry <br />In slope: 60' x 20' x 10' = 12,000 cf <br />• 444 cl' @ $5.00/cy = <br />Surface: 80' x 20' x 0' to 15'/2 = 12,000 cf <br />120' x 30' x 2' = 7,200 cf <br />19,200 cf <br />711 cY @ $2.00/cy = <br />Subtotal <br />B. Rail Track Removal <br />Material: 3,840 ft double track <br />3,840' x 2 -: 2,000'/day = 3.8 days Use 5 days <br />5 days x 5 men @ $160 = <br />1 10-ton crane @ 1 week = <br />1 semi @ 1 week = <br />Ballast <br />3,840' x 2 x 12' wide x 1' deep s 27 cf/yd = 3,413 cl' <br />3,450 yds @ $1.50/load haul <br />Subtotal <br />Re~roval Costs <br />$1,121 <br />$3,840 <br />$4,961 <br />$1,400 <br />$2,220 <br />$1,422 <br />$3,642 <br />$10,003 $10,100 <br />$4,000 <br />800 <br />1,000 <br />$5,175 <br />$10,975 <br />$80,000 $91,000 <br />Revised 10-10-88 <br />• <br />