Laserfiche WebLink
3. List any additional changes to the original prospecting and reclamation plan or <br />any unexpected problems (such as unexpected water or artesian conditions <br />encountered). (Attach additional pages, if needed.) <br />No problems. One exploration hole (#12) was eliminated. <br />4. When do you expect to complete all exploration and reclamation activities for <br />this project? <br />The mointoring wells will be in place for many years. <br />5. Does the prospector wish this report to be considered confidential? See Rule <br />2.02.7(2). No If yes, attach a justification for the request. <br />6. Additional Comments: <br />Reclamation liability for the monitoring wells will be assumed by the proposed Red Cliff Mine <br />at some point in the future (2008). <br />Date: November 16, 2006 <br />~~, <br />Srg~ of Authorized Representative <br />J. E. Stover & Associates, Inc. <br />Company <br />(11/Ot) Consulting Engineer, Authorized <br />Representative of CAM-Colorado LLC <br />