Laserfiche WebLink
VOLUME III <br />LIST OF FIGURES -CONTINUED <br />7b Prepazation Plant Material Temporary Stockpile Location <br />8 Leachate Concentration, Energy Mine No. 1 <br />9 Predicted Leachate Concentration, Energy Mine No. 1 <br />10 Leachate Chemistry, Energy Mine No. 1 <br />I1 Predictive Analysis - TDS Concentrations After 50 Yeazs <br />l la Existing Railroad Cross-Sections <br />llb Railroad Track Extension, Cross-Section, Typical Cut <br />11c Preparation Plant Topsoil and Plant Growth Media Stockpile Location <br />lld Wadge Overburden Potentiometric Surface & TDS Concentrations <br />12 Design of Typical Contour Furrow <br />12a Well 006-BRDH-7, Period of Record Watu Level Data <br />13 Predictive Analysis After Five Years of Mining <br />13a Pond E Aeratot <br />• 14 Typical Subsidence Monument <br />15 Typical Portal Seals <br />16 Rock Dust Bin Operations Design <br />16a Southwest Mining District Ventilation Borehole and Access Road Location <br />16b Gateroad Extension Area <br />16c 9 & 10 Right Gateroad Extensions <br />16d 1995 Seismic Lines - EMD <br />16e EMD Bleeder Shaft Grading Plan <br />76e(1) EMD Bleeder Shaft Site Plan <br />16f EMD Ventilation Site and Panel Description <br />16g Section 14 Mining Area: Structures & Renewable Resources <br />16h 8 Right Inby <br />16h(1) 6 Right & 7 Right Inby Development <br />16i 1996 Seismic Lines and Mine Water Return Line <br />16j North East Mains Rock Rooms <br />17 Substation Plan View <br />• 17a Portal Substation <br />18 Dewatexing Borehole Substation <br />PR 03-06 xi-a Revised 5/11/04 <br />