Laserfiche WebLink
COLORADO DEPARTMENT OF HEATH, Water Qrmliry' Division <br />Rnlionnte - Pnge !, PervniWo. CO-0043648 <br />COLORADO DISCHARGE, PERMIT SYSTEM (CDPS) <br />SUMMARY OF RATIONALE <br />CRIPPLE CREEK & VICTOR GOLD MINING COMPANY- CRESSON PROJECT <br />CDPS PERMIT NUMBER CO-0043648, TELLER COUNTY <br />TARLE OF CONTENTS <br />L TYPE OFPERMIT ............................................................................................................. ......................................................................1 <br />// FACILITY INFORMATION ................................................................................................ ....................................................................../ <br />1!/. WATER QUALITYASSESSMENT ...................................................................................... ......................................................................5 <br />/V. FAC/L/TYDESCR/PTION ................................................................................................. ......................................................................5 <br />V PERFORMANCE H/STORY ............................................................................................... ......................................................................6 <br />VL T£RMS AND COND/TIONS OF PERM/T ......................................................................... ......................................................................7 <br />VH. CHANGES MADE AFTER PUBLIC NOTIC£ .................................................................... ..................................................................../5 <br />TYPE OF PERMIT <br />II. FACILITYINFORMATION <br />A. Facility Type: <br />Fee Category: <br />Category Flow Range: <br />Annual Fee: <br />B. SIC Code: <br />Renewal <br />Hardrock Mining <br />Category 03, Subcategory 2 <br />SO,000gpd up to 999,999gpd <br />$1,533 <br />1041 <br />C. Legal Contact: Ron Largent, Vice President and General Manager <br />Cripple Creek & Victor Gold Miming Company <br />100 North Third Street <br />P.O. Box 191 <br />Victor, CO 80860 <br />(719) 689-4042 or 689-1977 <br />D. Facility Contact: Phil Barnes, ManagerEnvirorvuentalResources <br />Cripple Creek & Victor Gold Mining Cmnpany <br />100 North Third Street <br />P.O. Box 191 <br />Victor, CO 80860 <br />(719) 689-4056 or 689-2977 <br />Cripple Creek & Victor Gold Mining Company ("CC&V) is a joint venture of (1) <br />Anglogold (Colorado) Corp. and (1) Golden Cycle Gold Corporation. Golden Cycle <br />Gold Corporation is a publicly held company. Anglogold (Colorado) Corp. is n <br />wholly owned subsidiary of Anglogold North America, Inc. <br />E. Facility Location: Project site main entrance is in the NW'/, of Section 31, TI SS, R69W, at 1280 State <br />Highway 67 (The Cresson Project is located in portions of Sections 16, 17, 18, 19 <br />10, 21, 29, 30, 3/, and 32, TI SS, R69W, Sections 24 and 25 ofTl SS, R70W,~ Sections <br />7 and 8, T16S, R69W, and Sections 9, 10, and I5, TI6S, R70W.). <br />F Background <br />The main features ofthis project are a series ofsurface rnirres, including the main Cresson Mine, the East Cresson Mine, the <br />North Cresson Mine, and the South Cresson Mine; the Cresson Valley Leach Facility (VLF'), which has been constructed <br />over the upper,4requa Gulch drainage chamrel; the Adsorption, Desorption, Recovery (precious metals recovery) Facih'ty; <br />the Arequa Gulch Overburden Storage Area, which has been constructed upstream of the VLF; and the Squaw Gulch <br />Overburden Storage Area, located in the headwaters of Squaw Gulch. The location of the mining operation is shown in <br />Figures 1 and 2 of the permit. <br />