Laserfiche WebLink
E%BIBIT A - Legal dnacription - elthough qunrter/quarter section has <br />bean provided, section/tovnehip/range and principal meridian <br />mwt be added. <br />EXHIBIT B - Mining plan - equipment will be used to load out material <br />in the Ganistery, how will it be utilised, what will ba <br />the sequence of min~gg in this area, has topsoil and/ot over- <br />burden been removed sad stockpiled in the past, vill it ba <br />done in the future and if so what amounts have bean ramovadT <br />Boa will equipment be wed in the gravel extraction process, <br />what will or what is the aequance of mining, begin where <br />proceed is what direction, will topsoil and overburden ba <br />removed and has this been done in the past, if ea to what <br />depth, and where will it be stockpiled; will gravel be washed, <br />if so what ie the water source and hw much is required, <br />where will the crusher be Located, do you have eaieeion permit• <br />on the crusher, to what depth will you mine, and whet are the <br />existing slopes, what is the expected life of the mine for the <br />gravel operation. <br />E.~IISIT C - Maps - what is the scale of the map showing the two operations <br />areas and haul roadT Why have you not provided a legend for <br />this map? When was the haul road constructed and are theta <br />any other uses of the haul road other than miningT Whet is <br />the acreage of the haul road (also, length - width) and is it <br />included in the permit area. Topsoil end Overburden stockpiles <br />es well as crusher sitna should be shown here and cross referenced <br />to the mining plan narrative. <br />ERISIBIT P - Water Resources - are there any water requirements in the mining <br />operations? If so what are they and what is the sourceT <br />EXHIBIT E - Reclamation Plan - Gannister quarry - will a 15' hiRhwall remain <br />in the quarry after reclamation is completed? Hen any considsra- <br />tion been given to terracing the hiRhwell? To t3bat depth will <br />fines, overburden and/or topsoil be reepread. Specied diversity <br />is recommended is revegetation efforts in the quarry. At present <br />Indian Rice Graea is the only species proposed for revegetation <br />in the quarry. What number and size of junipers will be wad. <br />will planting be random, what is the nature of the material in <br />the waste dumps sad what equipment will be utili~ed in the <br />reclamation process. <br />Gravel Pit - will Pinal elopes be 3:1 as recommended by the <br />Soil Conservation Service? What amounts of topsoil, overburden <br />or fines exists and what amounts vili be replaced. (Depth in <br />inches l.e. 6"-12"). When vill all back alopea be revegetatsd, <br />what is considered "a flat manner" as elated in the application? <br />What ie meant by self regeneration of vegetationT Does thin <br />mean that revegetation will not be attempted? What equipment <br />will 6e wed in the reclamation procaes and how will it be wedT <br />Will erred be broadcast or drilled, will all species recommended <br />by the Soil Conservation Service be wed, what eb.rubs or trees <br />will be used, what source, size and will planting: b• random, <br />will the revegetated area be fertilised and what acran$a will <br />ba reseedadT You should also reference thin to t:he quarry. <br />