Laserfiche WebLink
• will be readily a'da ilable followiny a blast to rpnstruct eny be rrris, di[ches, sumps, etc. <br />around an; of the sulfate structures should Uiey be dama yed by fl, u~ck causing any <br />potential leak of nil. The Cu~cC also suyyested that the pumper for this well vrsually <br />inspect the well 3-4 hours f~•11r~winy the bla :: and for up to days after to ensuro that <br />the well rs func[i~~ning properly. <br />• <br />• <br />3 Fevised 02 /10i9P <br />