My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44289
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:43 PM
Creation date
11/20/2007 11:52:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/28/2004
Section_Exhibit Name
Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources, LLC <br />Permit No. 96DL103-6 <br />' Final Approval Colorado Department of Public Health and Environment <br />Page 5 Air Pollution Control Division <br />GENERAL TERMS AND CONDITIONS: IMPORTANTI READ ITEMS 6.6.7 AND Q <br />1. This permit is issued in reliance upon the acrwrecy and completeness of information supplied by the applicant and is <br />conditioned upon cendud of the activity, or censWction, installation and opereton of the source, in accordance with this <br />information and with representationsmadebytheapplicentorapplicenYsagents.Itisvalidonlyfortheequipmentand <br />operetions or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise,thegenerelandspecificcenditionscentainedinthispertnithavebeendetertnined <br />by the APCD to be necessary to assure compliance with the provisions of Section 26-114.5(7)(a), C.R.S. <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal of, a <br />condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be deemed <br />denied ab initio. This permit may be revoked at any time prior to final approval by the Air Pollution Control Division <br />(APCD) on grounds set forth in the Colorado Air Quality Control Ad and regulations of the Air Quality Control <br />Commission (AQCC), including failure to meet any express term or condition of the permit. If the Division denies a <br />permit, cenditions imposed upon a permft are contested by the applicant, orthe Division revokes a permft, the applicant <br />or owner or operator of a source may request a hearing before the AQCC for review of the Division's action. <br />4. This permit end any required attachments must be retained and made available for inspection upon request at the <br />location set forth herein. With respect to a portable sourcewhich is moved to a new locetion, a copy of the Relocation <br />Notice (required by lawta be submitted to the APCD whenevera portable source is relocated) should be attached to this <br />permit The permit may be reissued to a new owner by the APCD as provided in AQCC Regulation No. 3, Part 8, <br />Section III.B. upon a request for Vansfer of ownership and the submittal of a revised APEN and the required fee. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this activity or operetion of this <br />source. FinalapprovaloflhepertnitmustbesecuredfromtheAPCDinvrtifinginaccordancewdhtheprovisionsof25- <br />7-114.5(12)(a)GR.S. and AQCC Regulation Na. 3, Part B, Section IV. H. Final approval cannot be granted until the <br />operation or activitycemmences and has been verified by the APCD as conforming in all respectswhh the conditions of <br />• the permit IftheAPCDsodetertnines,itwiliprovidewrittemdocumentaticnofsuchfinalapproval,whididoesdonstitute <br />"final" authority to operate. Compliance with the permit conditions must be demonstrated within 180 days afMr <br />commencement of operatfon. <br />6. THIS PERMIT AUTOMATICALLYEXPIRES IF you (1) do not commence construction or operation within 18 months <br />after eflher the date of issuance of this permit or the date on which such construction or activity was scheduled to <br />commence as set forth in the pertnil, whicheveris later, (2) discontinue censtruction for a period of 18 months or more; or <br />(3) do not cemplete censtrodion within a reasonable time of the estimated completion date. Extensions ofthe expiration <br />date may be granted by the APCD upon a showing of good cause by the permittee prior tdhe expiration date. <br />7. YOU MUSTnottfytheAPCDatleastthirtydays(fitteendaysforpoAablesoun:es)priortocommencementofthe <br />permitted operation or activity. Failure to do so is a violation of Section 25-7-114.5(12)(a), C.R.S. and AQCC <br />Regulation No. 3, Part B, Section IV.H.1., and can result in the revoption of the permk. You must demonstrate <br />compliance with fhe permit conditions within 180 days after commencement of operation as stated in condition 5. <br />8. Secfion25-7-114.7(2)(a),C.R.S.requiresthatallsourcesrequiredtofileanAirPollutionEmissionNOtice(APEN)must <br />pay an annual fee to coverthe costs of inspections and administration. If a source or activity is to be discontinued, the <br />ownermust notifythe Division in writing requesting a cancellation ofthe permit. Upon notification, annual fee billing will <br />terminate. <br />9. Violation of the terms of a permft or of the provisions of the Colorado Air Pollution Prevention and centrol Act or the <br />regulations of the AQCC may result in administrative, dull or uiminal enforcement actions under Sections 25-7-115 <br />(enforcement),-121 (injunctions),-122 (civil penalties),-122.1 (criminal penalties), C.R.S. - <br />I• <br />029/0049/006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.