My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44241
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:41 PM
Creation date
11/20/2007 11:51:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
11/13/2007
Doc Name
Proposed air permit
From
Energy Fuels Resources Corp.
To
Air Pollution Control Division
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health and Environment <br />Air Pollution Control Division Page 4 of 6 <br />- MINING OPERATIONS - <br />I. <br />Will processing (i.e., crushing, screening, etc.) occur on site? NO <br />NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br />APEN. <br />PRIMARY CRUSHING <br />Maximum tons crvshed per yeaz: <br />Maximum tons crushed per hour: <br />Hours of crushing per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />SECONDARY CRUSHING <br />Maximum tons crashed per year: <br />Maximum tons crushed per hour: <br />Hours of crushing per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />Tons <br />Tons <br />Tons <br />Tons <br />Maximum tons screened per year: Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />RESCREENING/CLASSIFYING <br />Maximum tons screened per year: Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />J. CONVEYORS/TRANSFERPQINTS -Not Applicable (No processinH on-site) <br />Tons Of Material Conveyed Per Year <br />Tons Of Material Conveyed Per Day <br />Proposed Controls <br />^ Enclosure Type: <br />^ Other (specify) <br />Number Of Transfer Points <br />Proposed Controls <br />^ Enclosure Type: <br />^ Water Spray <br />^ Chemical Stabilizer <br />^ Other (specify) <br />(Indicate On A Separate Diagram How Conveyor System Is Set Up) <br />Tons. <br />Tons. <br />(Complete or Partial) <br />(Complete or Partial) <br />Revised September 2004 htto://www.cdohe.state.co.us/ao/s[ationarv.html <br />
The URL can be used to link to this page
Your browser does not support the video tag.