Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division Page 4 of 6 <br />- MINING OPERATIONS - <br />I. <br />Will processing (i.e., crushing, screening, etc.) occur on site? NO <br />NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br />APEN. <br />PRIMARY CRUSHING <br />Maximum tons crvshed per yeaz: <br />Maximum tons crushed per hour: <br />Hours of crushing per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />SECONDARY CRUSHING <br />Maximum tons crashed per year: <br />Maximum tons crushed per hour: <br />Hours of crushing per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />Tons <br />Tons <br />Tons <br />Tons <br />Maximum tons screened per year: Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />RESCREENING/CLASSIFYING <br />Maximum tons screened per year: Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />^ Moist Material <br />^ Water Spray <br />^ Enclosure Type: <br />^ Other (specify) <br />J. CONVEYORS/TRANSFERPQINTS -Not Applicable (No processinH on-site) <br />Tons Of Material Conveyed Per Year <br />Tons Of Material Conveyed Per Day <br />Proposed Controls <br />^ Enclosure Type: <br />^ Other (specify) <br />Number Of Transfer Points <br />Proposed Controls <br />^ Enclosure Type: <br />^ Water Spray <br />^ Chemical Stabilizer <br />^ Other (specify) <br />(Indicate On A Separate Diagram How Conveyor System Is Set Up) <br />Tons. <br />Tons. <br />(Complete or Partial) <br />(Complete or Partial) <br />Revised September 2004 htto://www.cdohe.state.co.us/ao/s[ationarv.html <br />