Laserfiche WebLink
Doc Date:12/11/2001 III 111l1!l111111111 <br />• SECTION 6.0 Stock Tank and Dozer Basin Construction Through 2000. <br />6.1 Stock Tanks <br />This section updates the location of all wnstructed stock tanks through 2000 (see Map(sj 3 Section 3.Oj. <br />The average tank density for Trapper mined-land areas will not exceed one tank per ten acres. Table 6- <br />1describes the as-built tank density in association with the specific drainage areas. <br />In 2000, Trapper constructed no new stock tanks. Several new stock may be constructed in 2001. <br />Existing stock tanks meet applicable certification standards. <br />6.2 Dozer Basins <br />As a result of the approval of technical revision TR-73 (1/97), dozer basin locations will be provided in <br />this Appendix W document on an annual basis (see Map(s) 3 Section 3.0). <br />Dozer basins assist sediment impoundments in the containment of sediment, reducing the frequency of <br />sediment impoundment cleaning. Dozer basins are typically constructed along haulroads, regraded <br />• spoils, and/or on short or long term disturbed sites. <br />cw 3ro+ <br />]OMG100PONDIeHGO] <br />