Laserfiche WebLink
• 1'racucU Approac~or Effective E $ S Control - .6 <br />EROSION CONTROL BENEFIT MATRIX <br />(ECBM) <br />ACCEPTANCE <br />EC =Environmental Compatibility <br />IA =Institutional Acceptance <br />VA =Visual Impact <br />COST <br />CM =Material Costs <br />CA =Add-ons <br />CI =Installation Costs <br />Cp =Preparation Costs <br />EFFECTIVENFSS <br />AD = Areal Density (%) <br />RO =Volume of Runoff {%) <br />I =Volume of Infiltration (%) <br />Y =Sediment Yield (tons/acre or % of control) <br />V =Reduction in Water Velocity (%) <br />K =Soil Texture Sensitivity <br />INSTALLATION <br />D =Durability <br />T =Tensile Strength <br />P =Puncture (i.e. Mullen's Burst) <br />L =Longevity <br />H =Face of Installation <br />S = ~ of Steps <br />M =Mechanical Factor <br />N =Native Material Incorporation <br />C =Curing Time <br />m 1995 iECA <br />