Laserfiche WebLink
! • <br />STAB OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 60203 <br />303 866-3567 <br />Fn X: 303 832-8106 <br />pF' COQ <br />~W _> q~ <br />N ~/ S g <br />. 8 <br />.. <br />~ 1876 ~ <br />Roy Romer, <br />Gwenar <br />Michael B. Long, <br />Dinsion Drteaor <br />DATE: May 21, 1992 <br />T0: Rob Mangone <br />FROM: Larry D. Oe 7er, Reclamation Specialist <br />RE: File No. M-92-016 <br />The following items must be addressed by the applicant in order to satisfy the <br />applicable requirements of C.R,S. 34-32-101 et sew. and the Mineral Rules and <br />Regulations of the Mined Land Reclamation Board. <br />General <br />1. You have provided the Division a copy of a public notice placed in the <br />Canon City Daily Record; however, in accordance with Rule 2.2.2.(2), you <br />have not provided proof of publication. Please provide this proof. <br />Z. You have provided a list of certified mailings and certified mail <br />receipts. In accordance with Rule 2.2.2(6), provide proof of required <br />notices by providing copies of signed return receipts. <br />Exhibit D - Mine Plan <br />At this time Rocky Mountain Materials and Asphalt, Inc. has no plans to <br />mine the Phase VI area. Neither a mine plan nor reclamation plan for <br />this area was submitted with the application. Provide a revised Mine <br />Plan Map that does not indicate that this area will be affected by mining <br />activities. Also remove reference to the mining of this area from the <br />Mining Plan Narrative. This phase should be added to the permit as an <br />amendment after the permit is issued. <br />An alternative to this would be to provide mining and reclamation plans <br />plus a list of permits applied for regarding the mining of this area. If <br />this alternative is chosen, you will have to notify ail applicable <br />parties and a new date would be set for consideration by the Division. <br />2. A power line owned by West Plains Electric is located within land to be <br />affected by mining. The mine plan as stated could adversely affect the <br />stability of the power poles. Provide detailed plans for the method you <br />will use to protect the stability of the poles. Or, provide a copy of an <br />agreement between west Plans Electric and Rocky Mountain Materials and <br />Asphalt, Inc. that states that damage to the power line will be <br />compensated for by the mine operator. <br />