My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44127
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:35 PM
Creation date
11/20/2007 11:49:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981275
IBM Index Class Name
Permit File
Doc Date
1/21/1982
From
DARRYL STOUT
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~„~ "w' e.. , . ~ ~ ,~ y ~ d.~h <br />., <br />Mined Land Re 81d $lon <br />423 Centennia~'~u~`~8ing; f31~j' $1~E~Gif~n St. <br />Aenver, flolorado 80203 <br />Dear Mr.« Janes: <br />1 <br />sss <br />Box 1056 <br />Meeker, Colo. 81641 <br />January 21, 1982 <br />I have reviewed your letter for compliance of adequacy on my part <br />and have the following answers for your questions and comments.. <br />f~ 'U'~~). I hereby verify that the access road on the maps accurately <br />~' reflect the County stipulation described on the Special Use Permit. <br />2). The depth of top soil to be removed and replaced will be the <br />same on all three phases,(approximatly). wee Exhibit D; Mining <br />Plan and Exibit E; Reclamation Plan. <br />3).. Refer to answer number 2. <br />4). The topsoil stockpiles will be stabilized with a suitable cover <br />of vegetation in order to minimize deterioration. See Exibit D; <br />Mining Plan and Exibit E; Reclamation Plan. <br />5)« kefer to answer number 2. <br />6)« Present Vegetation types are illustrated in Exibit I. Refer to <br />S.C.S. recommendation. <br />'])„ The reclamation will run concurrent per each 'phase of mining. <br />See exibit D. of tha 14inimg Plan. <br />8). The cost for reclamation listed in the application is for the <br />total mine. (L103,600.00). The cost per phase will be 1/3 of that <br />total cost. I therefor request that. the bond cost be considered on <br />1/3 of the total cost, (834,533.33). <br />.Sincerely, <br />Darryl Stout <br />
The URL can be used to link to this page
Your browser does not support the video tag.