Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action :New 110(c) Permit Application <br />Task description :Reapply Topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine : Cai D8R Sedes 11 - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization °!° <br />Cost Breakdown; Ownership cosUhour : $58.24 NA <br />Operating cosUhour : $73.75 100 <br />Ripper op.cosUhour : $3.43 50 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $168.20 Total fleet cost/hour : $168.20 <br />,: <,. <br />:; <br /> <br />MATERIAL QUANTITIES <br /> <br />;. <br /> <br />,. <br />Initial Swell Loose <br />volume : 12,100 LCY factor : NA volume : 12,100 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted hourly production : 491.9 LCY/hr <br />Material consistency descriptions <br />Consolidated stockpile <br />Average push gradient : 5.00 % (~ <br />Average site altitude : 5,400 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB, <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shiff/da <br />Spoil pile : 0.80 (fnd-ri) <br />Push gradient : 1.11 (Cat HB, <br />Altitude : 1.00 (Cat HB <br />Material weight : 0.87 (Cat H8, <br />Blade type : 1.00 (S/SU/U <br />Net correction : 0.48 <br />Adjusted unit production : 237.06 LCY/hr <br />Adjusted fleet production : 237'.06 LCY/hr <br />Total job time : 51.04 Hours <br />Unit cost : $0.710 /LCY Total job cost : $8,585 <br />