Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />Agency or organization name :DRMS <br />001 State :Colorado Permit/job # :M-2007-003 <br />05/08/2007 County :Fremont Abbreviation :none <br />DEG Site : Beedle Quarry Filename : M003-001 <br />Permit or other job action :New 1 f0(C) Permit Application <br />task description : Regrade Site <br />::.:. <.: <br /><: - ::: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Description <br />Scraper work team -Scraper :Cat 633E Series 2 (2001) <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Cost Bre <br />Road maintenance -Motor grader :NA <br />-Water truck :Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filenames : scraper2 NA NA NA NA misctmk <br />Utilization-machines : 100 NA NA NA NA 100 <br />-Ripperattachmenl:: NA NA NA NA NA NA <br />OwnerhipcosUhour: $81.70 NA NA NA NA $7.50 <br />OperatingcosUhour: $114.18 NA NA NA NA $14.66 <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />OperatorcosUhour: $24.95 NA NA NA NA $34.24 <br />Unit subtotals : $220.83 NA NA NA NA $56.40 <br />Number of units : 1 0 0 0 0 1 <br />Group subtotals : Work : $220.83 Support : $0.00 Maintenance : $56.40 <br />Total work team cosUhour : $277.23 <br />::: >~ <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 17,963 CCY factor : 1.125 volume : 20,208 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />