Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task # : 004 State :Colorado <br />Date : 05/09/2007 County :Fremont <br />User : DE:G Site :Beedle Quarry <br />Permit or otherjob aiction :New 1 f0(C) Permit Application <br />Task description :Mobilize/Demobilize Equipment <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment tmiler (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> OperatingcosUhour: $44.38 $46.13 $50.07 <br /> Operatorcost/hour: $27.66 $27.66 $27.66 <br /> HelpercosUhour: $0.00 $25.39 $25.39 <br /> Total Unit CosUhour : $88.67 $117.55 $125.45 <br />Machine <br />Description WeigtiUunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(Na. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />CasUhr/fleet DOT permit <br />CosUfleet <br />-Cat 633E Series 2 (2001) 56.34 $81.70 $125.45 1 $207.15 $125.45 $0.00 <br />-Cat D8R Series 11 - 8SU (20 52.55 $51.18 $125.45 1 $176.63 $125.45 $0.00 <br />-RevegEquipment 15.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br />sheet 1 of 2 <br />PermiUjob # : M-2007-003 <br />Abbreviation :none <br />Filename : M003-004 <br />Subtotals :~ $497.45 ~ 5339.57 <br />