Laserfiche WebLink
OR <br />Example: (N) 39.73691° <br />~ -104.98449° <br />l 1. <br />I2. <br />l3. <br />Latitude (N) (5 decimal places) <br />Longitude (W) - (5 decimal places) <br />OR <br />Universal Tranverse Mercator (UTM) <br />Example: 2013363E NAD27 Zone 13 <br />4398331.2 N <br />UTM Datum (specify NAD27, NADS3 or WGS 84) <br />Easting <br />Northing <br />Primary future (Post-mining) land use (check one): <br />Cropiand(CR) _ Pastureland(PL) <br />Rangeland(RL) _ Forestry(FR) <br />Residential(RS) _ Recreation(RC) <br />Developed WaterResources(WR) <br />Primary present land use (check one): <br />_ Cropland(CR) _ Pastureland(PL) <br />_ Rangeland(RL} _ Forestry(FR) <br />_ Residential(RS) _ Recreation(RC) <br />_ Developed Water Resources(WR) <br />_ General Agriculture(GA) <br />^~ Wildlife Habitat(WL) <br />_ IndustriallCommercial(IC) <br />_ Solid Waste Disposa](WD) <br />_General Agriculture(GA) <br />Wildlife Habitat(WL) <br />_ Industrial/Commercial(IC) <br />Method of Mining: _ Quarry (QR) _ Solution (SO) <br />Zone <br />13.1 Other: Briefly explain mining method (e.g. Placer, trucWshovel): _ <br />Nine feet high by twelve feet wide ddRS will be ddven through known ore bearing zones to allow for mining of ore using the modified room and <br />The ore bearing zone will then be ddlled and blasted. Ore and waste rock will be mucked out using small diesel baders and transported to the suAace using <br />low proFlle diesel haul trucks. Ore will then be hauled to an on-site mill. Waste rock will be stockpiled on site in designated locations. <br />